Can LoadGen handle multiple test results?

Yes. Each test run is stored in a timestamped table. This makes it very easy for the LoadGen Analyzer to switch between the results of two tests using the same charts.

In End-to-End Monitoring, all of the results are stored in one table, so you can make a trend analysis over time.

Was this article helpful?
0 out of 0 found this helpful